Back to Newsroom
Back to Newsroom

BCM Resources Starts AMT Geophysical Survey at Thompson Knolls Porphyry Copper-Gold Property, Millard County, Utah

Friday, 03 September 2021 08:30 AM

BCM Resources Corporation

VANCOUVER, BC / ACCESSWIRE / September 3, 2021 / BCM Resources Corporation (TSX-V:B), the "Company" is pleased to announce that it has contracted Industrial Imaging Co., Inc. (IIC), a Utah corporation to conduct Audio Frequency Magnetotelluric ("AMT") survey over its porphyry copper-gold property at Thompson Knolls ("TK") in Utah. The contractor is currently deploying its geophysical team to conduct the survey covering the TK property.

The data from this survey will produce a three-dimensional subsurface conductivity image of the Thompson Knolls property. IIC's proprietary hardware will be used for data acquisition, logging, and processing. IIC will provide trained personnel, proprietary 3D inversion algorithm, and dedicated computer system to obtain data from 121 stations. Deliverables will include ASCI files of tensor AMT sounding apparent resistivities and impedance phases with 3D Image of subsurface conductivity distribution. The IIC's report will include an interpretation and best sites for future drilling. AMT survey results will supplement the previously completed drone mag survey and are aimed to assist the drilling program to vector into the highest-grade parts of the QMP system discovery.

The drilling of TK21-2 resumed on August 21st, 2021, reaching the depth of 610 meters. As previously indicated, below 195.5 m of surficial post mineral cover the drilling went into quartz-monzonite porphyry ("QMP") with mostly quartz-sericitic-pyritic ("QSP") alteration bearing rare quartz veinlets and disseminated pyrite reaching zone of potassic alteration with Kspar veinlets towards the bottom. The core logging continues with core being sawed and prepared for assaying and petrographic studies.

TK is located approximately 200 km southwest of Rio Tinto's giant Bingham Canyon porphyry copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah.

The Company's Director, Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a 'qualified person' for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release.

About BCM Resources Corporation
BCM Resources Corporation is a diversified Canadian mineral exploration company now focused on completing Phase 1 discovery drilling of the Thompson Knolls property, its key asset. BCM also controls prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM Resources is managed by experienced and successful board members and advisors. For further information, including area maps, sections, and photos, please visit our web site at www.bcmresources.com or contact us by e-mail at [email protected].

ON BEHALF OF BCM RESOURCES CORP.
Sergei Diakov, President

For further information please contact:
Investor Relations,
Telephone: 1 (604) 646-0144, ext. 222
[email protected]
www.bcmresources.com

Caution Concerning Forward-Looking Statements
This news release and related texts and images on BCM Resource Corporation's website contain certain "forward-looking statements" including, but not limited to, statements relating to interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the company's projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in these work programs.

Forward-looking statements contained in this release are based on the beliefs, estimates, and opinions of management on the date the statements are made. There can be no assurance that such statements will prove accurate. Actual results may differ materially from those anticipated or projected. BCM Resources Corporation undertakes no obligation to update these forward-looking statements if management's beliefs, estimates, opinions, or other factors, should change.

This news release and the information contained herein does not constitute an offer of securities for sale in the United States and securities may not be offered or sold in the United States absent registration or exemption from registration.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDERS (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

SOURCE: BCM Resources Corporation

Topic:
Company Update
Back to newsroom
Back to Newsroom

Contact Us Today


If you have questions or want to learn more about our products, our team’s here to help!

Share by: