Back to Newsroom
Back to Newsroom

Murchison Minerals' Recent Modelling of Barre de Fer Zone Indicates Significant Potential for Expansion of High-Grade Ni-Cu-Co Zones

Monday, 04 April 2022 08:30 AM

Murchison Minerals Ltd.

BURLINGTON, ON / ACCESSWIRE / April 4, 2022 / Murchison Minerals Ltd. ("Murchison" or the "Company") (TSXV:MUR)(OTCQB:MURMF) is pleased to announce the results from the recently completed recompilation and modelling of holes drilled at the Barre de Fer (BDF) Zone on the 100% - owned HPM (Haut-Plateau de la Manicouagan) Project, located in Quebec. Based on these results the Company is advancing a strategy to expand and delineate the BDF Zone and surrounding prospective areas during this summer's planned drill program. In support of these plans, the Company is also pleased to announce that it has awarded the summer drilling contract, on the HPM property, to Logan Drilling.

The Company also wishes to invite interested parties to an Investor Webinar being hosted by CHF Capital Markets on April 12th at 2:00 EST where Troy Boisjoli - President and CEO of Murchison Minerals Ltd. - will be answering your questions on the HPM project. Questions can be submitted a head of time to: [email protected] To register copy and paste the link below in a supported browser:

https://tinyurl.com/MURWebinar0422

Murchison Minerals Ltd., Monday, April 4, 2022, Press release picture

Figure 1: Barre de Fer Zone Preliminary Nickel Mineralization Model, isometric view looking Northeast

Murchison Minerals Ltd., Monday, April 4, 2022, Press release picture

Figure 2: Barre de Fer Zone Preliminary Nickel Mineralization Model, isometric view looking Northward

BDF Zone and Hole Highlights

  • The BDF Zone (the "Zone") is currently defined by 25 diamond drill holes with 5,564 metres of drilling completed between 2001 and 2008
  • Based on the modelling, the Zone outcrops on surface, has a strike length of 315 m, and is composed of multiple stacked lenses over a maximum 150 m wide zone. Individual lenses have a maximum thickness of 28 m. The modelled mineralization extends to a vertical depth of 295 m. Extensive mineralization has also been intersected outside the current model, up to a vertical depth of 440 m. The Zone remains undrilled and unconstrained along strike and at depth.
  • Modelling indicates the setting, style, and high-grade characteristics of the BDF Zone are favourable for advancing a strategy to expand and delineate the Zone and surrounding prospective areas during this summer's planned drill program.
  • The BDF Zone is one of multiple Ni-Cu-Co prospects on the 100% - owned HPM Project, which is strategically located eight km from a rail line and within 30 km of Hart-Jaune hydroelectric power generating facility - located in Quebec, one of the world's most stable and best mining jurisdictions.
  • The fully compiled drill results for the Barre de Fer Zone are provided by Murchison in (Table 2).
  • Hole HPM-08-03 drilled to a depth of 345 m intersected five zones of Ni-bearing sulphide mineralization totalling 60.07 m of composite mineralization (Table 1 & 2), including:
    • 52.15 m grading 2.04% NiEq (74.45 m to 126.60 m) including 12.04 m at 3.00% NiEq (100.71 m to 112.75 m) and 10.56 m at 2.92% NiEq (85.16 m to 95.72 m)
  • Hole HPM-08-04 drilled to a depth of 171 m intersected five zones of Ni-bearing sulphide mineralization totalling 35.5 m of composite mineralization (Table 1 & 2), including:
    • 15.95 m grading 2.12% NiEq (47.73 m to 63.68 m) including 7.13 m at 2.92% NiEq (55.66 m to 62.79 m)
  • Hole 2002 drilled to a depth of 186 m intersected five zones of Ni-bearing sulphide mineralization totalling 63.85 m of composite mineralization (Table 1 & 2), including:
    • 10.60 m grading 1.90% NiEq (139.6 m to 150.20 m)
    • 18.1 m grading 1.23% NiEq (from 35.15 m to 53.25 m) including 3.03% NiEq over 4.15 m (39.45 m to 43.60 m)
  • Hole 151-02 drilled to a depth of 164 m intersected six zones of Ni-bearing sulphide mineralization totalling 21.70 m of composite mineralization (Table 1 & 2), including:
    • 16.45 m grading 1.60% NiEq (65.55 m to 82.00 m) including 2.60% NiEq over 3.95 m (65.55 m to 69.50 m)
  • Hole 151-04 drilled to a depth of 287 m intersected three zones of Ni-bearing sulphide mineralization totalling 61.00 m of composite mineralization (Table 1 & 2), including:
    • 60.40 m grading 0.61% NiEq (148.60 m to 209.00 m)
  • Assay results for all highlighted holes can be found in Tables 1 and 2 below. Assays for all holes can be found in Table 2.

Table 1: Highlight Holes Assay Results*

Hole

From (m)

To (m)

Length* (m)

Ni %

Cu %

Co %

Ni Eq. %**

HPM-08-03

52.54

54.96

2.42

0.47

0.19

0.03

0.61

70.86

71.36

0.5

0.37

0.29

0.02

0.54

74.45

126.6

52.15

1.52

0.79

0.08

2.04

includes

79.82

82.94

3.12

2.24

1.31

0.11

3.05

includes

82.43

82.94

0.51

2.3

4.81

0.12

4.44

includes

85.16

95.72

10.56

2.15

1.17

0.11

2.92

includes

100.71

112.75

12.04

2.35

0.88

0.11

3

includes

118.14

123

4.86

2.17

1.04

0.12

2.92

136.07

139.42

3.35

0.33

0.14

0.02

0.44

174.75

176.4

1.65

0.33

0.2

0.02

0.45

HPM-08-04

47.73

63.68

15.95

1.64

0.63

0.08

2.12

includes

55.66

62.79

7.13

2.31

0.76

0.11

2.92

125.4

130.5

5.1

1.23

0.47

0.06

1.59

136.75

139.4

2.65

2.08

1.24

0.11

2.85

144.17

154.92

10.75

1.05

0.63

0.06

1.44

includes

144.17

148.22

4.05

2.31

1.35

0.11

3.15

162.95

164

1.05

0.12

0.54

0.01

0.36

2002

24.2

24.6

0.4

0.94

0.52

0.07

1.33

35.15

53.25

18.1

0.93

0.28

0.07

1.23

includes

39.45

43.6

4.15

2.34

0.54

0.17

3.03

98.9

112.15

13.25

0.57

0.42

0.05

0.86

139.6

150.2

10.6

1.29

0.9

0.09

1.9

includes

143.15

149.05

5.9

2.06

1.15

0.15

2.92

includes

146.7

149.05

2.35

2.76

2.19

0.2

4.15

153.1

165.7

12.6

0.35

0.16

0.03

0.49

172.55

181.45

8.9

0.25

0.1

0.02

0.35

151-02

20.9

21.1

0.2

1.14

0.5

0.07

1.55

23.7

24.55

0.85

0.59

0.26

0.04

0.8

52

53.45

1.45

0.76

0.13

0.06

0.98

65.55

82

16.45

1.16

0.49

0.09

1.6

includes

65.55

69.5

3.95

1.88

0.87

0.14

2.6

137.7

138

0.3

0.34

3.8

0.03

1.85

143.95

146.4

2.45

0.36

0.14

0.03

0.49

151-04

68.25

68.35

0.1

0.38

0.08

0.03

0.51

86.2

86.7

0.5

1.92

0.54

0.14

2.54

148.6

209

60.4

0.44

0.21

0.03

0.61

includes

181.6

192.6

11

0.72

0.2

0.04

0.9

* Reported as core length, true thickness is not known. **Nickel Equivalent (NiEq) values were calculated using the following USD metal prices from Mar 23, 2022: $12.76/lb Nickel, $4.76/lb Copper and $37.20/lb Cobalt.

*Assays predate Murchison Minerals Ltd.; and were not subject to Murchison's QA/QC Procedures. Assays are as reported by Falconbridge, Rockwell Ventures Inc, and Manicouagan Minerals.

Murchison Minerals President and CEO Troy Boisjoli comments:

"The compilation and modelling by Murchison's technical team of previous exploration completed at the HPM project further demonstrates the mining-camp scale potential of the HPM project. The potential at Barre de Fer to grow a significant high-grade near-surface mineral resource, likely amenable to open-pit mining, is exceptional. The planned 2022 exploration program, based on the work of the technical team, will leverage previous exploration at BDF with the objective to materially advance the project."

Dr. Peter C. Lightfoot comments:

"The style of mineralization at Barre de Fer comprises both disseminated interstitial and net-texture sulfide as well as massive sulfide stringers and breccia sulfides. The consistent concentrations of Ni recalculated into 100% sulfide (~3%Ni in 100% sulfide) together with the complex textural relationships between the sulfides and the country rocks are all very encouraging features found in other magmatic sulfide mineral systems that are currently in production. These relationships together with the conductive signal of the higher grade mineralization provides a robust foundation on which exploration strategies can be based."

BDF Compilation and Modelling

The Company recently completed a comprehensive data compilation, verification and modelling program, comprising all drill hole data from the Barre de Fer Zone. The modelling program consisted of developing a preliminary 3D interpretation of nickel mineralization at BDF (Figure 1 and 2). Based on the modelling, the Zone outcrops on surface, extends to a vertical depth of 295 m, has a strike length of 315 m, and is composed of multiple stacked lenses over a maximum Zone footprint width of 150 m. Individual lenses have a maximum thickness of 28 m. However, extensive mineralization has been intersected to a vertical depth of 440 m, and the Zone remains undrilled and unconstrained along strike and at depth. No resource estimates have been completed on the Zone to date.

Hole 151-05 is the deepest hole in the Zone, originally drilled to a depth of 180 m, then extended to 473 m in 2002 (151-05EX). The final 293 meters of the hole intersected 93.45 m of nickel mineralization; there are currently no adjacent holes to this zone of mineralization, indicating significant potential within the Zone below 295 m (Figure 1 and 2).

­­­

Murchison Minerals Ltd., Monday, April 4, 2022, Press release picture

Figure 3: Location map of Barre de Fer Zone and Syrah Target Area superimposed on conductivity response from the 2021 VTEM survey

BDF Mineralization and History

The nickel-copper-cobalt mineralization at the BDF Zone consists of steeply dipping disseminations, stringers, net textured breccias and massive intervals of sulphide (pyrrhotite, chalcopyrite and pentlandite) hosted within a complex assemblage of norite, gabbronorite and peridotite. The Zone has been highly metamorphosed, and the sulphide mineralization is inferred to have been remobilized, indicating significant bodies of mineralization may yet be discovered.

The BDF Zone was first discovered in 1999 by Falconbridge through reconnaissance prospecting. It was first drill tested in 2001 with five diamond drill holes totalling 1,132 metres, intersecting significant high-grade Ni-Cu-Co bearing sulphide mineralization in four of the five holes. In 2002, the property was optioned to Rockwell Ventures Inc. who then completed seven holes, plus the extension of drill hole 151-05 (151-05EX) totalling 1,771 m of drilling. All seven holes, plus the extension hole 151-05EX intersected Ni-Cu-Co bearing sulphide mineralization.

In 2006, Pure Nickel Inc. purchased 100% of the property from Xstrata Nickel (formerly Falconbridge). In 2007 Manicouagan Minerals Inc. (Murchison Minerals Ltd.'s predecessor company) entered into an option agreement to earn up to 50% of the property from Pure Nickel Inc. In 2008, Manicouagan Minerals Inc. completed 13 holes totalling 2,661 metres of drilling at BDF, of which 11 holes intersected significant zones of Ni-Cu-Co bearing sulphide mineralization. Since the completion of the 2008 diamond drill program at the Barre de Fer Zone - which coincided with the beginning of a global recession - no further drilling has been completed. In 2019, Murchison Minerals Ltd. acquired 100% of the HPM project by purchasing the remaining 50% from Pure Nickel Inc.

Subject to the purchase agreement between Pure Nickel Inc. and Xstrata Nickel, Glencore retains certain rights with respect to the original mining claims area (Figure 4) including (i) a 2% NSR on each property (the Company has the right to re-acquire 1% thereof for CAD$1,000,000); (ii) off-take and marketing rights for all concentrate or product produced from the properties; and (iii) a one-time back-in right to 50% for any mining project with an economic threshold of 15,000,000 tonnes of resources by a) funding a feasibility study up to C$20,000,000, and b) making payment equal to two times the aggregate exploration expenditures to date.

Murchison Minerals Ltd., Monday, April 4, 2022, Press release picture

Figure 4: HPM Claim Area Map

BDF 2022 Delineation and Expansion

The Company is advancing a strategy to expand and delineate the Zone and surrounding prospective areas during this summer's planned drill program:

  • Drilling at Barre de Fer will focus on expansion and delineation of mineralization.
  • Exploration drilling will focus on the highly prospective Syrah target, which is located approximately 300 metres from BDF (Figure 3) and is situated above a 600-metre-long conductive area similar in response to BDF.

2022 Regional Exploration

  • The Company continues to await assay results from the 2021 fall drill program from the PYC Target due to lab delays.
  • An expanded VTEM survey - which covers the remaining 85% of the 576 km2 HPM property - scheduled to be completed this spring.
  • The summer prospecting program will focus on the high-priority targets identified by the VTEM coverage over 100% of the HPM property.

Table 2 Barre de Fer Drill Hole Assay Results*

Hole

From (m)

To (m)

Length* (m)

Ni %

Cu %

Co %

NiEq%**

HPM-08-01

32.80

39.92

7.12

0.19

0.07

0.02

0.26

78.60

85.00

6.40

2.02

0.87

0.11

2.66

includes

78.60

84.07

5.47

2.34

0.97

0.12

3.06

HPM-08-02

87.79

96.00

8.21

1.48

0.71

0.08

1.98

includes

90.46

92.91

2.45

1.98

1.30

0.11

2.80

99.38

100.09

0.71

2.02

0.83

0.10

2.62

105.66

106.08

0.42

0.02

2.46

0.00

0.95

HPM-08-03

52.54

54.96

2.42

0.47

0.19

0.03

0.61

70.86

71.36

0.50

0.37

0.29

0.02

0.54

74.45

126.60

52.15

1.52

0.79

0.08

2.04

includes

79.82

82.94

3.12

2.24

1.31

0.11

3.05

includes

82.43

82.94

0.51

2.30

4.81

0.12

4.44

includes

85.16

95.72

10.56

2.15

1.17

0.11

2.92

includes

100.71

112.75

12.04

2.35

0.88

0.11

3.00

includes

118.14

123.00

4.86

2.17

1.04

0.12

2.92

136.07

139.42

3.35

0.33

0.14

0.02

0.44

174.75

176.40

1.65

0.33

0.20

0.02

0.45

HPM-08-04

47.73

63.68

15.95

1.64

0.63

0.08

2.12

includes

55.66

62.79

7.13

2.31

0.76

0.11

2.92

125.40

130.50

5.10

1.23

0.47

0.06

1.59

136.75

139.40

2.65

2.08

1.24

0.11

2.85

144.17

154.92

10.75

1.05

0.63

0.06

1.44

includes

144.17

148.22

4.05

2.31

1.35

0.11

3.15

162.95

164.00

1.05

0.12

0.54

0.01

0.36

HPM-08-05

209.80

229.45

19.65

0.45

0.17

0.02

0.58

includes

209.80

212.33

2.53

0.98

0.23

0.05

1.21

254.55

255.20

0.65

0.29

0.06

0.02

0.36

HPM-08-06

115.11

117.90

2.79

0.18

0.13

0.01

0.26

HPM-08-07

*No Significant Intercepts*

HPM-08-08

81.32

81.45

0.13

2.23

0.03

0.13

2.61

85.13

87.34

2.21

0.38

0.08

0.03

0.49

104.47

107.44

2.97

0.81

0.12

0.05

0.99

140.25

142.80

2.55

0.76

0.30

0.04

1.00

includes

142.12

142.61

0.49

2.10

0.51

0.10

2.59

HPM-08-09

37.97

40.85

2.88

0.24

0.10

0.02

0.33

147.46

149.40

1.94

2.07

0.84

0.11

2.70

includes

147.75

149.40

1.65

2.39

0.88

0.13

3.08

HPM-08-10

34.90

35.60

0.70

1.64

0.12

0.09

1.94

42.60

43.20

0.60

0.75

0.48

0.05

1.07

48.00

48.60

0.60

0.24

0.07

0.02

0.32

95.75

96.25

0.50

0.35

0.44

0.02

0.58

100.60

101.10

0.50

0.60

0.06

0.03

0.72

109.74

110.31

0.57

1.13

0.27

0.06

1.41

121.39

123.46

2.07

0.63

0.08

0.03

0.76

HPM-08-11

44.85

45.35

0.50

0.14

0.89

0.01

0.50

47.47

48.78

1.31

2.28

0.81

0.11

2.91

80.78

81.68

0.90

2.10

1.37

0.11

2.92

88.80

89.46

0.66

1.14

0.33

0.06

1.45

97.28

118.70

21.42

0.59

0.29

0.03

0.78

131.90

132.40

0.50

0.38

0.07

0.02

0.47

140.20

141.50

1.30

0.72

0.19

0.04

0.92

142.50

144.20

1.70

0.33

0.24

0.02

0.48

HPM-08-15

35.30

39.20

3.90

0.54

0.15

0.03

0.70

includes

37.60

38.10

0.50

1.65

0.12

0.10

1.97

HPM-08-17

58.75

68.60

9.85

1.10

0.52

0.06

1.46

includes

64.30

67.75

3.45

2.35

1.03

0.12

3.07

77.30

78.00

0.70

0.15

1.68

0.01

0.81

86.50

87.00

0.50

0.74

0.07

0.04

0.88

93.60

94.10

0.50

0.38

0.07

0.02

0.47

127.85

128.80

0.95

0.81

0.38

0.05

1.10

132.25

134.20

1.95

2.69

2.61

0.12

4.01

149.15

149.65

0.50

0.51

0.21

0.04

0.69

2001

10.00

13.10

3.10

0.68

0.14

0.05

0.89

27.40

28.30

0.90

1.12

0.42

0.08

1.52

55.80

58.90

3.10

0.38

0.32

0.03

0.59

140.50

140.80

0.30

1.02

0.23

0.08

1.33

147.50

158.50

11.00

0.62

0.25

0.05

0.86

167.60

170.30

2.70

0.39

0.13

0.03

0.52

191.50

193.00

1.50

0.19

0.07

0.01

0.25

2002

24.20

24.60

0.40

0.94

0.52

0.07

1.33

35.15

53.25

18.10

0.93

0.28

0.07

1.23

includes

39.45

43.60

4.15

2.34

0.54

0.17

3.03

98.90

112.15

13.25

0.57

0.42

0.05

0.86

139.60

150.20

10.60

1.29

0.90

0.09

1.90

includes

143.15

149.05

5.90

2.06

1.15

0.15

2.92

includes

146.70

149.05

2.35

2.76

2.19

0.20

4.15

153.10

165.70

12.60

0.35

0.16

0.03

0.49

172.55

181.45

8.90

0.25

0.10

0.02

0.35

2003

7.80

8.35

0.55

2.19

0.18

0.16

2.71

86.60

88.60

2.00

2.46

0.66

0.17

3.22

2004

86.00

90.75

4.75

1.17

0.34

0.08

1.54

includes

86.00

87.95

1.95

2.48

0.62

0.17

3.21

102.20

105.35

3.15

0.17

0.12

0.02

0.28

110.65

114.10

3.45

2.46

0.41

0.17

3.11

144.80

152.70

7.90

0.81

0.38

0.07

1.14

164.90

171.45

6.55

2.49

0.88

0.18

3.33

2005

200.70

205.75

5.05

0.60

0.27

0.04

0.82

221.55

226.40

4.85

0.27

0.12

0.02

0.37

2006

31.15

52.10

20.95

0.45

0.24

0.03

0.64

includes

31.15

37.90

6.75

0.77

0.36

0.06

1.06

60.95

62.50

1.55

0.85

0.17

0.06

1.09

70.20

72.60

2.40

1.02

0.20

0.07

1.30

89.65

96.60

6.95

0.19

0.09

0.02

0.28

111.30

115.60

4.30

0.37

0.19

0.02

0.51

2007

9.10

9.35

0.25

0.39

0.19

0.02

0.50

123.10

125.80

2.70

0.41

0.23

0.03

0.57

131.80

134.60

2.80

0.23

0.12

0.01

0.32

151-01

19.00

24.80

5.80

1.12

0.27

0.08

1.46

includes

19.00

22.30

3.30

1.54

0.30

0.11

1.99

28.75

28.90

0.15

1.58

0.11

0.12

1.98

94.60

102.50

7.90

1.20

0.44

0.09

1.64

includes

95.40

97.90

2.50

2.63

1.14

0.20

3.64

151-02

20.90

21.10

0.20

1.14

0.50

0.07

1.55

23.70

24.55

0.85

0.59

0.26

0.04

0.80

52.00

53.45

1.45

0.76

0.13

0.06

0.98

65.55

82.00

16.45

1.16

0.49

0.09

1.60

includes

65.55

69.50

3.95

1.88

0.87

0.14

2.60

137.70

138.00

0.30

0.34

3.80

0.03

1.85

143.95

146.40

2.45

0.36

0.14

0.03

0.49

151-04

68.25

68.35

0.10

0.38

0.08

0.03

0.51

86.20

86.70

0.50

1.92

0.54

0.14

2.54

148.60

209.00

60.40

0.44

0.21

0.03

0.61

includes

181.60

192.60

11.00

0.72

0.20

0.04

0.90

151-05

48.50

48.80

0.30

0.26

0.10

0.02

0.35

51.00

51.40

0.40

0.40

0.09

0.03

0.53

151-05EX

265.65

275.00

9.35

0.26

0.11

0.02

0.37

278.55

287.65

9.10

0.25

0.10

0.02

0.35

324.80

335.20

10.40

0.20

0.08

0.01

0.27

341.75

349.80

8.05

0.20

0.08

0.02

0.29

367.50

371.75

4.25

0.30

0.13

0.03

0.42

386.90

394.90

8.00

0.22

0.09

0.02

0.33

400.40

444.70

44.30

0.34

0.15

0.03

0.49

151-06

72.30

78.00

5.70

0.22

0.11

0.02

0.32

86.40

86.60

0.20

1.17

0.18

0.08

1.48

132.65

142.00

9.35

0.45

0.16

0.04

0.62

includes

135.30

135.90

0.60

2.25

0.36

0.15

2.84

159.50

160.20

0.70

0.40

0.23

0.03

0.58

189.70

202.10

12.40

1.15

0.44

0.08

1.56

includes

198.10

200.10

2.00

2.01

0.72

0.14

2.70

209.50

211.80

2.30

0.62

0.59

0.05

0.99

230.10

234.40

4.30

0.68

0.62

0.05

1.07

237.60

238.70

1.10

0.30

0.21

0.03

0.46

253.90

255.70

1.80

0.74

0.29

0.06

1.02

276.80

277.20

0.40

0.34

0.21

0.04

0.52

282.00

283.20

1.20

0.78

1.07

0.07

1.39

286.50

289.70

3.20

0.35

0.24

0.04

0.55

* Reported as core length, true thickness is not known. **Nickel Equivalent (NiEq) values were calculated using the following USD metal prices from Mar 23, 2022: $12.76/lb Nickel, $4.76/lb Copper and $37.20/lb Cobalt.

*Assays predate Murchison Minerals Ltd.; and were not subject to Murchison's QA/QC Procedures. Assays are as reported by Falconbridge, Rockwell Ventures Inc, and Manicouagan Minerals.

Table 3 BDF Drill Hole Collar Information

Hole

Easting UTM*

Northing UTM*

Elevation (m)

Azimuth (°)

Dip (°)

Length (m)

HPM-08-01

614906

5722686

884.4

231

-71

126

HPM-08-02

614906

5722686

884.4

231

-85

111

HPM-08-03

614978

5722766

892.6

231

-60

345

HPM-08-04

614978

5722766

892.6

231

-45

171

HPM-08-05

615057

5722830

900

231

-46

300

HPM-08-06

615045

5722748

897.7

231

-46

229.8

HPM-08-07

615045

5722748

897.7

231

-58

225

HPM-08-08

614960

5722704

894.6

231

-44

201

HPM-08-09

614960

5722704

894.6

231

-62

240

HPM-08-10

614905

5722775

885.1

231

-44

201

HPM-08-11

614905

5722775

885.1

231

-60

195

HPM-08-15

614777

5722698

874.4

51

-45

64

HPM-08-17

614814

5722722

875.9

51

-45

252

2001

614860

5722828

882

231

-45

198

2002

614888

5722783

884.5

234

-74

186

2003

614893

5722723

887.3

231

-45

129

2004

614918

5722819

884.9

231

-69

263

2005

614964

5722845

887.6

231

-70

302

2006

614884

5722897

880.6

231

-45

203

2007

614845

5722918

878

231

-45

197

151-01

614894

5722723

887.8

231

-70

200

151-02

614881

5722844

883

231

-70

164

151-04

614972

5722784

892.6

231

-70

287

151-05,

151-05EX

614959

5722907

885.5

231

-70

473

151-06

614887

5722949

880.6

231

-70

301

*UTM Projected Coordinate System: NAD83 UTM Zone 19N.

About the HPM Project

The HPM Project (the "Project") is located east of the Manicouagan structure, the site of a major 215 Ma impact event. The extensive reservoir at Manicouagan supports five hydro-power plants. The existing Quebec Cartier rail line, located eight kilometres west of the PYC project area, links Labrador City to Port Cartier and Sept Iles, two major iron ore port facilities.

Murchison Minerals Ltd., Monday, April 4, 2022, Press release picture

Figure 5: HPM Location Map

The Project is located within the Haut-Plateau de la Manicouagan area. The claims host prospective gabbroic, ultramafic and anorthositic rock bodies within the Manicouagan metamorphic complex and are associated with significant nickel-copper-cobalt sulphide mineralization first identified by Falconbridge in 1999 and discovered extensive nickel-bearing sulphide mineralization at Barre de Fer during drilling in 2001 - 2002. Pure Nickel and Murchison Minerals Ltd.'s predecessor - Manicouagan Minerals - continued drilling in the area until 2008. The majority of the past drilling at the HPM Project targeted the Barre de Fer geophysical conductor and confirmed the presence of nickel-copper-cobalt sulphide mineralization over approximately 315 metres strike length to a depth of 295 metres. The mineralization remains open at depth and along strike.

After Murchison Minerals Ltd. acquired 100% ownership of the property in 2019, the Company has focused exploration work on the camp-scale potential of the region. Aerial EM surveys completed in the spring of 2021 identified more than 50 anomalous conductors. Prospecting crews were able to traverse five of the more than 50 anomalies and discovered new outcrops of nickel-bearing sulphide mineralization in the process. The prospecting program was followed by an inaugural drill program at the PYC target area - an EM anomaly with a 1.95 km strike length. Subsequent to the completion of the drill program at PYC, the Company increased its dominant land position in the Haut-Plateau region from 139 km2 to 576 km2.

Qualifying Statement

The foregoing scientific and technical disclosures on the HPM Project have been reviewed by John Shmyr, P.Geo., VP Exploration, a registered member of the Professional Engineers and Geoscientists of Saskatchewan and current holder of a special authorization with the Ordre des Géologues du Québec. Mr. Shmyr is a Qualified Person as defined by National Instrument 43-101.

About Murchison Minerals Ltd. (TSXV: MUR OTCQB: MURMF)

Murchison is a Canadian‐based exploration company focused on nickel-copper-cobalt exploration at the 100% - owned HPM Project in Quebec and the exploration and development of the 100% - owned Brabant Lake zinc‐copper‐silver project in north‐central Saskatchewan. The Company also holds an option to earn 100% interest in the Barraute VMS exploration project also located in Quebec, north of Val d'Or. Murchison currently has 160.6 million shares issued and outstanding.

Additional information about Murchison and its exploration projects can be found on the Company's website at www.murchisonminerals.ca . For further information, please contact:

Troy Boisjoli, President and CEO or
Erik H Martin, CFO
Tel: (416) 350‐3776
[email protected]

CHF Capital Markets
Thomas Do, IR Manager
Tel: (416) 868-1079 x 232
[email protected]

Forward‐Looking Information

Certain information set forth in this news release may contain forward‐looking information that involves substantial known and unknown risks and uncertainties. This forward‐looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals.

FLI herein includes, but is not limited to: future drill results; stakeholder engagement and relationships; parameters and methods used with respect to the assay results; the prospects, if any, of the deposits; future prospects at the deposits; and the significance of exploration activities and results. FLI is designed to help you understand management's current views of its near- and longer-term prospects, and it may not be appropriate for other purposes. FLI by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such FLI. Although the FLI contained in this press release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure shareholders and prospective purchasers of securities of the Company that actual results will be consistent with such FLI, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such FLI. Except as required by law, the Company does not undertake, and assumes no obligation, to update or revise any such FLI contained herein to reflect new events or circumstances, except as may be required by law. Unless otherwise noted, this press release has been prepared based on information available as of the date of this press release. Accordingly, you should not place undue reliance on the FLI or information contained herein. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in FLI. Assumptions upon which FLI is based, without limitation, include: the ability of exploration activities to accurately predict mineralization; the accuracy of geological modelling; the ability of the Company to complete further exploration activities; the legitimacy of title and property interests in the deposits; the accuracy of key assumptions, parameters or methods used to obtain the assay results; the ability of the Company to obtain required approvals; the results of exploration activities; the evolution of the global economic climate; metal prices; environmental expectations; community and nongovernmental actions; and any impacts of COVID-19 on the deposits, the Company's financial position, the Company's ability to secure required funding, or operations. Risks and uncertainties about the Company's business are more fully discussed in the disclosure materials filed with the securities regulatory authorities in Canada, which are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Murchison Minerals Ltd.

Topic:
Company Update
Back to newsroom
Back to Newsroom

Contact Us Today


If you have questions or want to learn more about our products, our team’s here to help!

Share by: